LIRSOT LTD INFRASTRUCTURE

INFRASTRUCTURE of LTD Lirsot

The LIRSOT Ltd infrastructure represents an organizational and technical complex providing the best conditions for conducting a cycle of R&D and production of the commodity output.
The backbones of the LIRSOT Ltd infrastructure are:
Power facilities including:
- steam boiler-room ensuring the thermal energy supply to the enterprise heating system and for the technological processes;
- water-intake facility with a system of artesian wells, accumulating reservoirs and main conduits;
- network of electrical substations providing a reliable power supply;
A laboratory building comprising research departments;
A block of industrial buildings with working experimental-industrial equipment for production and textile processing of polyimide, aramide, carbon, ion-exchange, and semipermeable (membranous) fibers.

INFRASTRUCTURE of LTD Lirsot

The functioning of this infrastructure in a proper manner is ensured by the staff of the Chief Engineer Service composed of the mechanic section, chief power engineer service, maintenance department, section of instrumentation and automated control systems.

The performance quality control system consists of: the testing department, central laboratory of the enterprise, laboratory of physical and mechanical testing, standardization laboratory.

In broad terms the quality level of the performed certificated work is set by the OOO LIRSOT management in compliance with the international standard ISO 9001:2000.

 

Alexander G. ZAKHAROV
Chief Engineer

LIRSOT Company Ltd.

Kolontsov Str., Mytischi Town, Russia, 141009

Phone/Fax: (495) 583-8354; 510-5629
E-mail: lirsot@mail.ru